Skip to main content
Prototype · Synthetic dataScenario of Connected Journey ↗Demonstration data

Connected Alpine Journey

One fictional family journey from the Lake Geneva region to an Alpine resort — shown as the passenger experiences it, and as the industry operates it.

Scenario controls

No disruption introduced. All connections currently hold.

Passenger view

Anna

What Anna sees on her phone.

Language:
Deutsch
Traveller:
Travelling with family (2 adults, 2 children)
Preferences:
Minimal transfersLuggageSki equipmentFamily seatingWeather awareness

Notification

Guten Morgen Anna. Ihre Reise nach Serlanz ist pünktlich. Umsteigen in Rhonebrück, Gleis 7. Heute Neuschnee im Ferienort.

Same underlying event. Only the passenger communication changes. RM, PT, ES and 中文: architecture ready, not yet available in this demonstration.

  1. 07:12–08:40

    Mainline train

    Lémanrive → Rhonebrück

    On time

    Platform 3 ·

  2. 08:52–09:40

    Alpine regional connection

    Rhonebrück → Valdor

    Connection safe

    Platform 7 · Transfer 6 min

  3. 10:02–10:40

    Rack railway to the resort

    Valdor → Serlanz

    Connection safe

    Platform 1 · Transfer 5 min

  4. 10:55–11:05

    Electric shuttle to the hotel

    Serlanz station → Hotel Arvenhof

    Connection safe

    Transfer 6 min

  5. 11:15–11:45

    Early check-in, luggage and ski storage

    Connection safe

    Transfer 5 min

  6. 12:20–12:40

    Gondola to the ski area

    Serlanz village → Plan Arolla

    Connection safe

    Transfer 10 min

  7. 12:50–14:50

    Family ski lesson

    Connection safe

    Transfer 5 min

Weather: Fresh snow overnight, clear afternoon. Lift operating normally.

Return journey on day 5 follows the same chain in reverse and is not affected by today's disruption.

Operations view

The passenger experiences one journey.

The industry operates 14 systems across 8 organisations. Innovaforte Mobility helps connect the intelligence between them.

  1. National Rail

    07:12
    • Timetable
    • Ticketing
    • Passenger information
    • Capacity
  2. Regional Rail

    08:52
    • Timetable
    • Passenger information
    • Staff
    • Assets
    • Capacity
    • Disruption
  3. Mountain Railway

    10:02
    • Timetable
    • Mountain transport
    • Capacity
    • Weather
    • Passenger information
  4. Resort Transfer

    10:55
    • Destination
    • Hotel
    • Passenger information
  5. Hotel

    11:15
    • Hotel
    • CRM
    • Payments
  6. Mountain Lift

    12:20
    • Mountain transport
    • Weather
    • Capacity
    • Ticketing
  7. Activity provider

    12:50
    • Events
    • Destination
    • CRM
    • Payments

Demonstration data · All places, operators, people and times in this demonstration are fictional. Operators are shown as generic labels only.

What connected intelligence could identify

No disruption introduced. All connections currently hold.

Suggested actions

Illustrative decision support

No disruption introduced. All connections currently hold.

Nothing is executed automatically. People remain responsible for every decision.

How real data could arrive later

The scenario is structured so future connectors could supply the same data:

  • GTFS
  • GTFS-Realtime
  • NeTEx
  • SIRI
  • APIs
  • Webhooks
  • CSV
  • Database feeds
  • Manual operational data

None of these are connected. This demonstration runs on fictional data.

Discuss a mobility pilot

Your systems do not need to be replaced to start. We can begin with one journey, one operational problem or one data connection.